Hesperia Branch Library
Opening October 2006
Please click on any image to view a larger version.
|
|
Pictures taken in November 2005 |

|
Main entrance of the library. |
|
|
| |

|
Looking through library steel framing with the new City Hall in the background. |
|
|
| |

|
Tall steel structure is the fireplace in the Heritage Room. |
|
|
| |

|
View of the steel framing of the Hesperia Branch Library. |
|
|
| |

|
View of the steel framing of the Hesperia Branch Library. |
|
|
|
Pictures taken in October 2005 |

|
Aerial view of the Hesperia Library footings outline and conduit. The concrete is scheduled to be poured in the middle of October 2005. |
|
|
| |

|
Aerial view of the Hesperia Community Civic Plaza looking west from Seventh Street. Seventh Street is at the bottom of the picture. |
|
|
|
Pictures taken on September 8, 2005 |

|
Electrical conduit in place and ready for concrete. |
|
|
| |

|
Looking from 7th Street and Juniper Street, you can see trenches being dug for sewer lines. |
|
|
| |
Ground Breaking Ceremony July 1, 2005 |

|
Hesperia Branch Library Sign. |
|
|
| |

|
Officials from the City of Hesperia, County of San Bernardino and volunteers begin the "process”. |
|
|
| |

|
Anthony Adams presented a check to the building fund on behalf of Supervisor Bill Postmus. |
|
|
| |

|
Local swing band, Phat Cat Swinger entertained. |
|
|
| |
Pictures taken on August 25, 2005 |

|
Grading has been completed. |
|
|
| |

|
Trenches are being dug for building foundation. |
|
|
| |

|
Looking from 7th Street and Juniper Street. |
|
|
|