Upcoming Projects


   
2012 Upcoming Projects--Road (pdf)
2012 Upcoming Projects--Flood Control (pdf)
Road Projects
Recently Awarded
Amount Project - Limits - Type of Work - Contractor Award Date Gen'l Loctn
$102,862.00 Montclair-Chino Area Slurry Seal - Slurry Seal - Sully-Miller Contracting 10/18/2011 Montclair / Chino
$349,864.00 San Bernardino Valley Area Slurry Seal - Slurry Seal - Sully- Miller Contracting 10/18/2011 Fontana / Rialto
$1,515,843.00 South Fork Road Bridge Replacement - Precast Concrete Bridge - KEC Engineering 10/18/2011 Lytle Creek
$1,211,000.00 Meridian Road Rehabiltiation - Rehablitation Work - Matich Corporation 11/1/2011 Lucerne Valley
$2,200,197.00 Valley Blvd Repave - Banan Ave to Catawba Ave - All American Asphalt 12/13/2011 Fontana
 
Recently Opened
Amount Project - Limits - Type of Work - Contractor Award Date Gen'l Loctn
$191,110.00 Howard Street Sidewalk Project - Central Ave to Vernon Ave - Gentry Brothers, Inc. 11/17/2011 Montclair
 
Recently Advertised
Amount Project - Limits - Type of Work Bids Open Gen'l Loctn
$74,293.00 Howard Street Sidewalk Improvement - 260' West of Benson Ave to Benson Ave 1/12/2012 Montclair
$659,140.00 South Fork Road (Phase II) Rock Slope Protection - 200 Feet West of Lytle Creek Road 2/2/2012 Lytle Creek
 
Upcoming
Amount Project - Limits - Type of Work Est. Advertise Date Gen'l Loctn
$144,500 24th Street Drainage Improvement - San Antonio Heights 2/21/2012 San Antonio Heights
$154,000 Almond Ave - Upast Court to Ivy Ave - Drainage/Widening 3/27/2012 Fontana
$984,000 Arrow Route - Beach Ave to Almeria Ave - Rehab 2/21/2012 Fontana
$77,740 Bonnie Baker Senior Center Parking Lot - Big River Area 2/21/2012 Big River
$745,000 Calabash Ave Repaving - Whittram to Foothill - Rehab 1/31/2012 Fontana
$1,464,555 Caughlin Road - Phelan Rd to Smoke Tree Rd Prob 1B - Plan Review? 3/20/2012 Phelan
$1,200,000 Cedar Ave Median - El Revino Rd to Jurupa Ave - Concrete Median 11/13/2012 Bloomington
$3,202,118 Cherry Avenue Phase II - Whittram to Foothill - Widening, Median, Paving 4/10/2012 Fontana
$5,992,953 Cherry Avenue - S/ of Rancho Vista to Whittram - Bridge Widening e2020? 10/2/2012 Fontana
$101,000 Citrus Avenue - Argyle to Blythe Ave- C&G, Sidewalk and ADA Ramp 3/27/2012 Del Rosa
$495,267 Coyote Trail - El Centro Rd to Cedar St 1/31/2013 Hesperia
$1,400,000 Escondido Ave - At El Centro - Box Culvert 4/24/2012 Hesperia
$98,000 Eureka Street Sidewalk - Golondrina Dr to Sterling Ave - Conrete Sidewalk 5/8/2012 San Bernardino
$75,000 Falling Leaf Drive - Retaining Wall - Green Valley Lake 4/3/2012 Green Valley Lake
$260,000 Fifth Avenue at Walnut +HA0160 - Intersection Improvement 3/13/2012 San Bernardino
$13,543,092 Glen Helen Parkway - Realignment & Grade Separation 7/31/2012 San Bernardino
$97,000 Grandview Road - Sawmill Rd to Augusta Dr - Overlay 7/31/2012 Lake Arrowhead
$523,000 Hemlock Avenue - Whittram to Foothill - Rehab 3/13/2012 Fontana
$443,426 Highland Road At SH 18 - Lucern Vly- Turn Pocket 3/13/2012 Lucerne Valley
$54,000 Hook Creek Road - At Cumberland Dr - Drainage 4/24/2012 Lake Arrowhead
$1,100,000 Live Oak Drive - SH 330 to SH 18 - Rehab 2/14/2012 Running Springs
$275,808 Lone Pine Canyon - Wrightwood 4/10/2012 Wrightwood
$1,923,800 Maple Lane - Slope Improvements - Moonridge 2/8/2013 Big Bear
$1,000,000 National Trails Hwy - 4.43 Miles W of Amboy Rd to 0.16 Mile E of Amboy Rd Cutoff - Resurfacing 2/14/2012 Amboy
$1,300,000 Oak Glen Road - Acorn Way to Pine Bench Rd - Rehabilitation 1/31/2012 Oak Glen
$1,709,550 Phelan Road - Drainage - Two Locations along Phelan Rd. 4/24/2012 Phelan
$150,355 Phelan Road @ Lilac - Realignment 5/22/2012 Phelan
$412,000 Pine Drive - Lake Arrowhead - Culvert & Retaining Wall 5/8/2012 Lake Arrowhead
$3,000,000 Pine View Drive Storm Drain - RCB 4/24/2012 Big Bear
$354,621 Pipeline Ave - Chino Av to Biscayne - Sidewalk 5/8/2012 Chino
$531,000 Reche Canyon Road - Westwood Dr to N of Placid Ln - Widening 4/24/2012 Colton
$265,227 Roswell Avenue - Sidewalk - Chino Area - Philadelphia to Francis 9/4/2012 Chino
$477,040 Rotary Way- Signal - 3/13/2012 Yucca Valley
$3,000,000 Santa Ana River tr - Ph III (SB/Redlands) 10/2/2012 SB / Redlands
$1,557,590 Slover Ave Phase IA & IB- (Signals/Widening) T01590 7/3/2012 Fontana
$2,000,000 Starlite Mesa Dr & Others -Overlays - Landers Area 6/12/2012 Landers
$41,019,042 Summit Valley Road - Roadway Widening - SH138 to Ranchero Rd 2/6/2013 Hesperia
$500,000 Valley Boulevard At Banana Ave Signal 10/8/2012 Fontana
$97,934,993.43
~TRANSPORTATION PROJECTS TOTAL
Flood Control Projects
 
Upcoming
Estimate Project - Limits - Type of Work Advt. Date Gen'l Loctn
$3,339,410.00 Alabama at City Creek II - RCB 5/22/2012 San Bernardino
$3,500,000.00 Cactus Basin #3 - Recharge/Detention Basin/Spillway 4/10/2012 Rialto
$2,306,307.00 Desert Knolls Wash - Apple Valley Rd to Toscola 5/31/2014 Apple Valley
$2,000,000.00 Elder Creek Channel - Ungrouted Rock Channel 7/31/2012 Highland
$5,100,000.00 Lytle-Cajon Channel Invert Repair - Concrete Invert 7/31/2012 San Bernardino
$1,500,000.00 Mojave River Levee Phase 2 - Ungrouted Rock Slope Protection 4/10/2012 Apple Valley
$7,200,000.00 Mountain View Acres S.D. - Double RCB 3/13/2012 Victorville
$7,200,000.00 Oro Grande Basin # 9 - Recharge/Retention Basin/Spillway 7/31/2012 Victorville
$865,300.00 Plunge Creek - Spillway Repair (Concrete) 1/22/2013 Highland
$1,500,000.00 Rialto Channel Crossings @ Randall, Merrill & Foothill - Double RCB's/Concrete Trap Channel 7/31/2012 Rialto
$3,700,000.00 Sand/Warm Creek Confluence - Ungrouted Rock Channel 1/6/2015 Highland / San Bernardino
$2,700,000.00 Sheep Creek - Grouted Rock Bank Protection 4/17/2012 Wrightwood
$700,000.00 Wilson Creek Improvements - Concreted Rock Slope Protection 10/25/2019 Yucaipa
$41,611,017.00 ~FLOOD CONTROL DISTRICT PROJECTS TOTAL



Copyright © 2007. All rights reserved. Department of Public Works, County of San Bernardino, California